HeadlineDock

Guntur Railway Station Subway Shut Until June 30 for Infrastructure Upgrades

HD
By HeadlineDock
6/18/2026

The pedestrian subway at Guntur Railway Station will remain closed from June 19 to June 30 to allow for critical drainage improvement works. Passengers are advised to use designated Foot Over Bridges as alternative crossing facilities to navigate the station safely during this period.

Guntur Railway Station Subway Shut Until June 30 for Infrastructure Upgrades

Highlights

  • The pedestrian subway at Guntur Railway Station will be closed from June 19 to June 30.
  • The closure is to facilitate essential drainage improvements to prevent groundwater seepage.
  • Maintenance work aims to prevent waterlogging and enhance safety for passengers.
  • Travelers are advised to use designated Foot Over Bridges (FOBs) as alternative crossings.

Travelers navigating through Guntur Railway Station are advised to plan their journeys carefully starting tomorrow. The pedestrian subway located at the station will be closed to the public from June 19 through June 30. This temporary closure is essential to facilitate critical infrastructure maintenance aimed at improving long-term facility standards.

Infrastructure Upgrades at Guntur Station

The South Coast Railway's Guntur division has officially announced that the closure is required for comprehensive drainage improvement works. These measures are specifically designed to address persistent issues with groundwater seepage that have impacted the subway area in previous seasons. By expanding the existing sump and undertaking structural enhancements, railway authorities aim to effectively manage water accumulation.

Addressing these drainage concerns is a proactive step to prevent potential waterlogging, particularly as the region prepares for the upcoming monsoon season. The project reflects an ongoing commitment by the Guntur division to prioritize passenger safety and comfort by mitigating hazards associated with internal flooding in transit pathways. While the closure may cause temporary inconvenience, the upgrades are expected to provide a more reliable and secure environment for commuters traversing the station grounds.

Navigating During the Subway Closure

During this period, passengers are strongly encouraged to utilize alternative crossing methods to move between platforms. Railway authorities have confirmed that the Foot Over Bridges (FOBs) and other designated crossing facilities will remain fully operational. Using these established alternatives will ensure that foot traffic remains fluid despite the subway being inaccessible for the duration of the maintenance window.

Officials from the South Coast Railway have appealed for the public's patience and cooperation while these vital improvements are carried out. Passengers should allocate extra time for their transitions within the station premises, as navigation patterns may change slightly while the subway is offline. Railway staff will be on-site to assist with directions and ensure that commuters can reach their respective platforms safely and efficiently throughout the maintenance period ending on June 30.

By investing in these drainage systems, the administration is taking necessary precautions to ensure that Guntur Railway Station remains a functional and safe hub for all visitors. Travelers are urged to remain aware of these ongoing updates and to follow all posted signage when navigating the station area during this short-term upgrade project.