Bullet Trains Coming to India: B28 & B35 Models Set to Boost Railways
Indian Railways is set to launch homegrown bullet trains, B28 and B35, aimed at modernizing India's railway network. The B28 will operate between Surat and Vapi by August 2027, while the B35 is designed for even higher speeds, showcasing a commitment to technological advancements and self-reliance.

Highlights
- •Bullet trains, B28 and B35, represent significant modernization in Indian Railways
- •B28 tops out at 250 km/h while the upcoming B35 aims for 320 km/h operational speed
- •The B28 will commence operations between Surat and Vapi by August 2027
- •These trains are part of India's broader high-speed rail network aimed at improving connectivity
Indian Railways is taking significant strides towards modernizing its transportation network, with the launch of homegrown bullet trains. The first model, the B28, represents a major technological advancement, while the upcoming B35 is set to redefine high-speed travel in the country.
Key Features and Specifications
The B28 train is engineered for a top speed of 280 km/h but will typically operate at 250 km/h. The Indian Railways plans to launch the first B28 by March 2027, marking a significant milestone in national infrastructure.
Following the completion of the B28 project, the Ministry of Railways intends to develop an even faster model, B35. This new model is designed to achieve speeds up to 350 km/h with operational speeds at 320 km/h. The focus on innovation and local sourcing showcases India's commitment to self-reliance in critical technological domains.
Manufactured by the Bharat Earth Movers Limited (BEML) in Bengaluru, the B28 trains will consist of 8 fully air-conditioned cars. These trains are designed for passenger comfort and include advanced infotainment systems. The B35 train, while more advanced, leverages technology sourced from Japan to ensure cutting-edge performance.
Routes and Impact
The B28 will commence services between Surat and Vapi, covering about 97 kilometers. This route is part of the broader Mumbai-Ahmedabad bullet train project and is expected to be operational by August 2027. The Railways plan to extend its high-speed corridor network further, including routes like Delhi-Varanasi, Mumbai-Pune, and Bengaluru-Chennai.
The introduction of these trains will not only reduce travel time significantly but also boost the country's overall transportation efficiency. High-speed rail is expected to enhance connectivity, cut costs, and drive economic growth through improved logistics and tourism.














